
Presently, 83 percent of the bullet train station’s slab level work is completed
The MAHSR corridor consists of 24 river bridges, with 20 positioned in Gujarat and the remaining four in Maharashtra.
Today, the National High-Speed Rail Corporation Limited (NHSRCL) which is overseeing the development of this crucial project shared a video…
Spanning 7 kilometers between Shilphata and BKC, this groundbreaking project employs cutting-edge techniques such as the Tunnel Boring Machine (TBM)…
The National High-Speed Rail Corporation (NHSRCL) to install 28 seismometers along the Mumbai-Ahmedabad ‘bullet train’ corridor, employing an ‘Early Earthquake…
JICA, a key funding partner for India’s major infrastructure ventures, including metro projects and rural development initiatives, has been actively…
Notably, the project is being funded by Japan International Cooperation Agency (JICA) and is being implemented by an authorised Japanese…
Railways Minister Ashwini Vaishnaw said in a latest update on the land acquisition, revealing that the entire 1389.49 hectares needed…
These projects underscore Gujarat’s commitment to future-proof transportation, sustainable energy solutions, and economic growth, positioning the state as a frontrunner…
The Hub building features a dedicated Concourse Floor (at the third-floor level) for passengers, offering amenities such as waiting areas,…
The NHSRCL achieved the 100-kilometer viaduct construction milestone through the deployment of the ‘Full Span Launching technique’ (FSLM), utilizing 40-meter…
The Anand HSR station, situated 600 meters away from Uttarsanda Railway station, will feature a white exterior and interior design…
The largest land acquisitions were made in Surat (160.51 hectares), Vadodara (140.3 hectares), Bharuch (140 hectares), and Ahmedabad (133.29 hectares).
A total of 28 steel bridges will be erected for the Mumbai- Ahmedabad High Speed Rail (MAHSR) corridor.
The National High Speed Rail Corporation Limited (NHSRCL) has completed the mountain tunnel in a short span of 10 months.
The facility is spread over an area of 1 lakh square metre and houses state-of-the-art technology to manufacture track slabs…
Designed in the style of Japanese Shinkansen depots, the Thane depot encompasses a sprawling area of 57 hectares and boasts…
The station is anticipated to be completed and ready for operation by March 2028.