
The donated trains are expected to arrive in early 2026 and will be retrofitted with specialised inspection tools.
As per the plan, the indigenously built Indian Bullet train with 280 kmph maximum speed will run from 2030 to…
Plans for indigenous high-speed trains are laudable, but innovative financing models will be needed.
The bridge was completed on January 2, 2025, marking significant progress in the development of the high-speed rail corridor.
These slabs form a crucial component of the Mumbai-Ahmedabad Bullet Train project, India’s first high-speed rail initiative.
One of the standout safety features is the Early Earthquake Detection System, which will use 28 seismometers along the Mumbai-Ahmedabad…
The National High-Speed Rail Corporation Limited (NHSRCL) has unveiled the designs of the 12 high-speed rail stations, each one carefully…
The trainsets, which will have a test speed of 280 km/h, will be the first indigenously designed and manufactured high-speed…
These escalators will feature advanced safety mechanisms to ensure rapid response in case of emergencies, marking a major upgrade in…
Mumbai-Ahmedabad Bullet Train: The Bullet Train project will showcase an impressive 21 km long single-tube tunnel, which includes a 7…
The PSC bridge, having spans of 40, 65, 65, and 40 meters, passes through one of the busiest sections of…
Japan’s Shinkansen operates in a relatively clean environment characterized by moderate summers and snowy winters. In contrast, India’s environmental conditions…
With rapid progress being made, officials report that crucial structural work and the concourse and rail-level slab have been successfully…
The video highlights the advanced track-laying techniques being utilized, showcasing the dedication to ensuring the project’s timely completion.
The excavation work is part of a larger initiative designed to alleviate congestion and improve transportation across Mumbai for the…
With the completion of this bridge, project teams will be better positioned to continue their work, ultimately paving the way…
The casting of the box girder is a crucial element in the construction of the train track, which aims to…
As of now, 350 kilometers of pier foundations, 316 kilometers of pier constructions, 221 kilometers of girder casting, and 190…