Mismatch between RE capacity and demand driving up power costs: Electricity Authority
India’s target of achieving 500 GW of renewable energy by 2030 has led to a strain on grid operations and increased power supply costs. Despite reaching 50% of its installed electricity capacity from renewable sources, transmission plans are based on potential rather than actual capacity, causing high charges and uncertain grid absorption.