
The 100-day ‘UP Global City’ campaign has been launched in all the 762 urban bodies.
Varanasi-Madhosingh-Prayagraj Doubling Project is 120.2 km long, and the estimated cost is Rs 1293.58 crores.
After the modification, the office complex is proposed to be eight storeys. Earlier, it was to be proposed to be…
The state government has to take a final decision as to whether Neo Metro should be implemented.
The commutation between South and East Delhi, and Noida and Ghaziabad will be easier and signal-free after the completion of…
The report titled ‘Issues relating to Untraceable Monuments and Protection of Monuments in India’ was submitted to the Parliamentary Standing…
Notably, Uttarakhand Chief Minister Pushkar Singh Dhami also said that Pant informed him about the potholes, reported The Indian Express.…
The ministry has identified 61 projects with a total length of 1,264 km as a part of the Port Connectivity…
In the similar vein, the elevated road from Samrala chowk till MC limits via Bharat Nagar Chowk may bring big…
Connecting Alibaug (in Raigad district) to Virar (in Palghar district), the Multi-Modal corridor is a high-speed expressway.
The run is on a 3 km stretch – from Aarey Sariput Nagar to Marol station.
The Delhi-Mumbai expressway is being developed as an 8-lane access control green field expressway.
The government had decided to set up as many as 35 Multi Modal Logistics Parks, at a total capital cost…
Need to build capability of urban local bodies to create infrastructure projects funded by private investors, banks
According to the Ministry of Statistics and Programme Implementation, which monitors infrastructure projects of Rs 150 crore and above, out…
At a public function, PM Modi will inaugurate and lay the foundation stone of multiple projects worth over Rs 2,450…
The YEIDA has asked the DMRC to present the complete DPR by March 31, 2023.
“The urban transport, let’s say metro rail has reached 824 kilometres and is operational which was zero in 2002. Another…