
PM Modi will inaugurate the Kavi Subhash-Hemanta Mukhopadhyay and the Taratala-Majerhat metro sections during his visit.
The Ruby Hall to Ramwadi stretch, spanning 5.5 km and comprising four stations – Bund Garden, Yerawada, Kalyani Nagar, and…
Spanning a length of 10.8 kms and with a width of 5.5 meters, a 520-meter segment of the tunnel traverses…
The Prime Minister inaugurated and laid the foundation stone for numerous National Highway projects valued at over Rs 18,100 crore.
Among the several projects the Prime Minister laid the foundation for today is Phase II of the Raghunathpur Thermal Power…
The Prime Minister unveiled Indian Oil’s Haldia-Barauni Crude Oil Pipeline, stretching over 518 kilometers, with a development cost of approximately…
Check steps to apply for solar rooftop installation.
PM Modi initiated several rail projects surpassing Rs 17,600 crore, including crucial connections like Sone Nagar to Andal and Tori-Shivpur…
PM Modi will participate in another public event in Arambagh, Hooghly, West Bengal, where he will lay the foundation stone…
With the corridor length of 23 km (18 km elevated and 5 km underground), the Meerut Metro consists 13 stations
Modi and Jugnauth will jointly dedicate the new airstrip, and the St James Jetty along with six community development projects
The state witnesses an infra push with 36 infrastructure projects valued at over Rs 17,000 crore.
The Union Home Minister dedicated 10 projects each in Daman and Diu, and 33 projects in Dadra and Nagar Haveli.
The deployment of high-capacity nodes at each station will ensure uninterrupted connectivity, enabling commuters to enjoy high-speed internet, make voice…
Dhaka has already allowed India to use its Chittagong Port through South Tripura’s Sabroom sub-division and Maitri setu is set…
This reflects overall cost overruns of Rs 4,80,456.61 crore (18.41 per cent of the original cost).
The bridge spans 2.32 kilometres, with a central double-span cable-stayed portion covering 900 metres, accompanied by a 2.45-kilometre-long approach road.
Trains will be available every three minutes in this section between 8:45 am and 10:20 am on all working days,…