Mumbai-Ahmedabad Bullet Train project advances with 4.88 km Ghansoli tunnel breakthrough
The Mumbai-Ahmedabad bullet train project achieved a breakthrough for a 4.88 km-long tunnel between Shilphata and Ghansoli. The tunnel, part of the 21 km underground stretch, was excavated using the NATM method. The breakthrough now connects the Savali shaft to the tunnel portal at Shilphata, linking it to the viaduct portion of the project.