Mumbai-Ahmedabad Bullet Train Project advances

Mumbai-Ahmedabad Bullet Train Project advances

Oct 07, 2023

Anish Mondal

NHSRCL erects first steel bridge for MAHSR corridor

70-metres-long bridge built across NH-53 in Surat

A total of 28 steel bridges will be erected

673 metric tonnes of steel used in Main Bridge

Length of the main bridge: 70 mtrs

Launching nose length: 38 mtrs

Steel bridge to support operation of Shinkansen Bullet train

Bullet Train to run at a speed of 320 km per hour

Swipe up to know more

Learn more