• Rajasthan

    Cong 98
    BJP 74
    RLM 3
    OTH 24
  • Madhya Pradesh

    Cong 111
    BJP 110
    BSP 2
    OTH 7
  • Chhattisgarh

    Cong 67
    BJP 17
    JCC 6
    OTH 0
  • Telangana

    TRS-AIMIM 95
    TDP-Cong 21
    BJP 1
    OTH 2
  • Mizoram

    MNF 26
    Cong 5
    BJP 1
    OTH 8

* Total Tally Reflects Leads + Wins

Blast at India-developed hydroelectricity project in Nepal weeks before inauguration by Modi

By: | Published: April 29, 2018 2:29 PM

A bomb exploded today at the office of a hydroelectricity project being developed with Indian assistance in eastern Nepal, an official said, weeks before its inauguration by Prime Minister Narendra Modi.

nepal, hydroelectric power, hydroelectric power plant, hydroelectric energy, nepal blast, hydroelectricity plant blast, modi, pm modi, narendra modiNo one was injured in the blast and an investigation has been launched. (Representational Image: PTI)

A bomb exploded today at the office of a hydroelectricity project being developed with Indian assistance in eastern Nepal, an official said, weeks before its inauguration by Prime Minister Narendra Modi. The compound wall of the 900 MW Arun III Hydroelectric Power Plant’s office in Tumlingtar area, nearly 500 km from here, was damaged in the explosion, said Siva Raj Joshi, Chief District Officer of the Sankhuwasabha district.

The project is slated to come into operation by 2020. The blast comes at a time when preparations are going on for laying foundation stone of the project by Modi during his official visit to Nepal on May 11. No one was injured in the blast and an investigation has been launched, he said.

However, no one has claimed responsibility of the blast, he added. A Project Development Agreement (PDA) for Arun III was signed with India’s state-owned Satluj Jal Vidyut Nigam (SJVN) on November 25, 2014 in the presence of the then Prime Minister Sushil Koirala and visiting Indian Prime Minister Modi.

This is the second blast within a month in Indian properties in Nepal. On April 17, a pressure cooker bomb went off near the Indian Embassy field office in Biratnagar damaging the walls of the premises.

Nepal is currently facing shortage of power and the production of hydropower from the project will mainly serve its domestic demands.

The project is expected to bring in USD 1.5 billion foreign direct investment into Nepal and create jobs for thousands of people.

Get live Stock Prices from BSE and NSE and latest NAV, portfolio of Mutual Funds, calculate your tax by Income Tax Calculator, know market’s Top Gainers, Top Losers & Best Equity Funds. Like us on Facebook and follow us on Twitter.

Switch to Hindi Edition